Dodge Island Road Bridge Replacement

Dodge Island Road Bridge

Status: In Progress
Location: Dodge Island Road, near the intersection of Norton/Old River Road, bridging across the Dodge Island Slough.
Project Description: Replacement of 4-span timber bridge built in 1963 that provides access to rural residents and resource land. Design is currently in progress.
Impacts: Access to and from the latter half of Dodge Island Road will be effected during construction.
Contractor: Consor (engineering and design)
Schedule: Environmental and design studies are planned for 2024 and construction is anticipated for 2025.
Last update: October 20, 2023

For more information see our project flyer

Hayden Road Bridge Replacement

Covered Hayden Road Bridge

Status: In Progress
Location: Hayden Road covered bridge, just off of the intersection of Alsea Highway.
Project Description: Replacement of 4-span timber covered bridge built in 1918. Current bridge requires a weight limit that prohibits full access of the area and structurally deficient. The bridge will remain as a pedestrian bridge alongside the new bridge. Design and planning are in progress.
Impacts: Access to and from Hayden Road will be affected through construction.
Schedule: Primary design will continue through 2024 with construction anticipated to start in 2025.
Last update: November 30, 2023

For more information see our project flyer